City Hall Water Filler Station

Project Type:
Capital Project
Project Status: 
Budgeted
Date Received: 
Tuesday, February 24, 2026
Location: 
501 Evergreen Pt Rd
Medina, WA 98039

  

The City of Medina is soliciting proposals to install a water filler station in the City Hall Lobby area.  Please see attached pictures:

Scope:   

  • Remove existing drinking fountain
  • Install electrical outlet for new station (there is an outlet on the other side of the wall)
  • Restore wall and paint as necessary for installation
  • Install surface mounted, Filtered Water Bottle Filler Station with drinking fountain (Elkay LZS8WSSP or equal)
  • WA STATE Prevailing Wage
  • Working hours are limited to M-F 8a-4p

 

Proposals are due via email February 27 , 2026 by 4:00p to: rosada@medina-wa.gov

Project Contact
Ryan Osada
Public Works Director
City of Medina
425.233.6439
206.423.3278 mobile
 

 

 

 

 

 

 

 

 

 

 

The City of Medina is soliciting proposals to install a water filler station in the City Hall Lobby area.  

 

Scope:

 

Remove existing drinking fountain

Install electrical outlet for new station (there is an outlet on the other side of the wall)

Restore wall and paint as necessary for installation

Install surface mounted, Filtered Water Bottle Filler Station with drinking fountain (Elkay LZS8WSSP or equal)

WA STATE Prevailing Wage

Working hours are limited to M-F 8a-4p

Proposals are due via email February 27 , 2026 by 4:00p